Washrooms

Washroom Refurbishment

Client

RPC

Brief

Washroom Refurbishment

Value

£40,000

Duration

4 Weeks

Start Date

September 2016

  • Trough
  • Trough and Airblades
  • IPS and Trough
  • Corridor
  • Corridor 2

 Works Incorporated:

  • Removal and demolition of existing staff wash facility in dust sensitive environment.
  • Erection of dust screens, utilised dust control mats upon exit/ entry.
  • Installation of structural supports and infill to existing drainage channel.
  • Extension of existing structure to create a new access corridor and enlarged wash facility.
  • New partitions, suspended ceilings and LED lighting.
  • Hygienic lllumitex decoration and the inclusion of a crisp corporate branded orange band to feature walls.
  • Cap and cove vinyl floor.
  • Solid compact grade laminate IPS with a stainless steel wash trough, sensor taps and Dyson airblade hand-driers, accompanied by drain-off drip trays.