Commercial

Industrial Fitout

Client

Igus UK Ltd

Brief

Entrance Lobby, Office and WC Reconfiguration

Value

£500,000

Duration

13 Weeks

Start Date

July 2017

  • Glazed Partition
  • Stairs
  • Glazed Elevation
  • Glazed Elevation Internal
  • Lift and Stairs Internal
  • WC Cubicles
  • Sink/ Vanity
  • Office Space
  • Internal Stair
  • Internal Stair/ Lift
  • Balustrade
  • Urinals
  • Lobby

  • Works Incorporated:

    Lobby:

    • New bespoke powder coated metal pan ceiling system.
    • Top-Range wall vinyl application.
    • Renewal of floor finishes.
    • New doorsets and frames throughout.

    WC Facilities:

    • Strip out ceilings, lighting and sanitaryware and vanity units, new underfloor drainage connections.
    • New wall layout formed in blockwork and plastered to take finishes.
    • New bespoke powder coated metal pan ceiling system.
    • Made to order stainless steel cubicle systems utilised.
    • Perfectly aligned wall and floor tile finishes supplied.
    • Refurbishment of existing tiled floor finishes.
    • Full range of stainless steel fixtures and fittings including one of a kind access panels.

    Office Reconfiguration:

    • Removal of old means of entrance and installation of 2no bespoke, powder coated staircases.
    • Extension of ground floor glazed partitions to be reflected at first floor level.
    • New glazed aluminium doorsets to reflect those at ground floor level.
    • Expansion of useable floor space across existing single storey structure to create 500sqm single office at first floor.
    • Removal and renewal of all floor finishes.
    • Redecoration throughout, including fire rated finishes to steelwork.
    • MF Ceiling with cover trims at board joints.