Commercial
Industrial Fitout
Client
Igus UK Ltd
Brief
Entrance Lobby, Office and WC Reconfiguration
Value
£500,000
Duration
13 Weeks
Start Date
July 2017
-
Works Incorporated:
Lobby:
- New bespoke powder coated metal pan ceiling system.
- Top-Range wall vinyl application.
- Renewal of floor finishes.
- New doorsets and frames throughout.
WC Facilities:
- Strip out ceilings, lighting and sanitaryware and vanity units, new underfloor drainage connections.
- New wall layout formed in blockwork and plastered to take finishes.
- New bespoke powder coated metal pan ceiling system.
- Made to order stainless steel cubicle systems utilised.
- Perfectly aligned wall and floor tile finishes supplied.
- Refurbishment of existing tiled floor finishes.
- Full range of stainless steel fixtures and fittings including one of a kind access panels.
Office Reconfiguration:
- Removal of old means of entrance and installation of 2no bespoke, powder coated staircases.
- Extension of ground floor glazed partitions to be reflected at first floor level.
- New glazed aluminium doorsets to reflect those at ground floor level.
- Expansion of useable floor space across existing single storey structure to create 500sqm single office at first floor.
- Removal and renewal of all floor finishes.
- Redecoration throughout, including fire rated finishes to steelwork.
- MF Ceiling with cover trims at board joints.